Name
Lontar Unit 4 CFPP 1 x 315 MW
Contractor
Black & Veatch
Constrution year
2017
Address
Tangerang, Banten Province,Indonesia
Bonna Indonesia supplies cooling water piping solutions for construction of Unit 4 of Lontar Coal Fired Steam Power Plant in Indonesia.
State electricity company PLN has contracted with a consortium of Sumitomo Corporation, Black and Veatch International Company and local contractor PT Suryamitra Surya Perkasa to carry out coal-fired power plant PLTU Lontar expansion project with a capacity of 315 MW. The project is part of the government’s 35,000 MW ambitious power plant program.
Bonna Indonesia delivered RCCP pipes (ND2400 mm), special fittings and cradles with seismic design for the onshore and above ground cooling water system. The RCCP installer is SSP.