SPAM Regional Jatiluhur I Upstream

Name

SPAM Regional Jatiluhur I Upstream

Contractor

WIKA - JAYA KONSTRUKSI KSO

Constrution year

2023

Address

Bekasi, Jawa Barat, Indonesia

Bonna Indonesia played a pivotal role in the SPAM Regional Jatiluhur I Upstream project by providing 4.4 kilometers of high-quality RCCP ND1800 pipes and special fittings

SPAM Regional Jatiluhur I Upstream project initiated by a consortium of PT. Jaya Construction Manggala Pratama Tbk; PT. Wijaya Karya (Persero) Tbk; PT. Tirta Gemah Ripah or known as the PT Wika Tirta Jaya Jatiluhur consortium that has cooperated for 30 years to increase the provision of access to safe drinking water for the community.

PT Bonna Indonesia is proud to participate in playing a pivotal role in transforming water infrastructure in the region by providing RCCP pipes and special fittings with internal diameter of ND 1800 mm installed by open trench method covering approximately 4.4 km.

This project has been commissioned on late 2024 and will provide drinking water supply of 4,750 liters per second to 380,000 house connections or to around 1.9 million people in Jakarta and West Java, mostly located in Bekasi Kota, Bekasi Regency, and Karawang Regency.

Source:

Jakarta's ground level continues to subside: Jatiluhur I SPAM project construction must be on time (pwc.com)KPBU - Progress Proyek SPAM Regional Jatiluhur I (kemenkeu.go.id)

Owner: WIKA Tirta Jaya Jatiluhur
EPC: WIKA - JAYA KONSTRUKSI KSO
RCCP Installer: CPM
Bonna Pipes Manufacturer: PT. Bonna Indonesia, a CONSOLIS subsidiary
Total Length: 4,417.50 meters
Diameter: ND1800
Pressure: 6 bar

More references