For Microtunneling & Jacking Project

Bonna Complete Technical Solution

Bonna can provide customer with a complete technical solution for jacking & microtunneling project such as: cooling water system and desalination pipeline of power plant, cooling water system for industrial plant, pipeline for water supply and sewerage, sleeve pipeline for utility project.

Power Plant

Desalination Plant

Refinery

Infrastructure

Water Transmission

Fertilizer Plant

Petrochemical Plant

5 Key Advantages of Bonna RCCP for Offshore Project


1. Large Diameter 

Manufactured up to 4,000 mm in diameter for high flow capacity


2. Durability

Durable and reliable, ensuring a lifetime of dependable service


3. Simplified Construction

Easy to connect underwater and required less civil works

4. Low head loss
Smooth, with low head loss characteristics for low-cost performance

5. Custom-made solution
Custom-designed for the project needs and configuration

1. Large Diameter

  • Bonna Pipe RCCP is manufactured up to 4,000 mm in diameter
  • Water pipelines and industrial plants use and circulate large quantities of water that needs large-diameter pipe
  • Large diameters deliver cooling water with desirable velocities, lower friction losses, and therefore lower pumping costs

2. Durability

  • The RCCP pipeline withstands full vacuum conditions
  • The protection of steel by concrete is permanent, therefore no need for maintenance
  • The external reinforced concrete compressive allows for jacking or microtunneling method
  • Bonna pipe concrete inner wall does not require any specific protection against abrasion thanks to its high strength & compactness

3. Simplified Construction

  • Bonna Pipe RCCP is jacked in one single operation thanks to the steel cylinder embedded in reinforced concrete pipe (no need for casing)
  • Bonna Pipe RCCP can be designed for jacking installation in curve
  • Bonna Intermediate Jacking Station allows to reduce number of pits
  • Comprehensive design review and preliminary plan & drawing integrate technical discussion to comply with conditions at construction site

4. Low Head Loss

  • Roughness Coefficient “k”=0.0001m  corresponds to the internal lining of the Bonna pipelines RCCP
  • The manufacturing and installation processes for Bonna Pipe RCCP result in pipelines with smooth surfaces across the joints between adjoining pipe units
  • The concrete or mortar lining does not deteriorate with age when flowing full

5. Total Custom-made Solution

Before execution of the contract, Bonna Pressure Pip

Before execution of the contract, Bonna Pressure Pipes’ design and engineering office helps customers to optimize their system and works with you for all the technical aspects.

During the performance of the contract, the design and engineering office works out all the technical documents required for the project. In particular:

  • The bills of materials and piping arrangement drawings for the pipes and special fittings for manufacturing and for laying
  • Detailed drawings of the equipment and/or accessories supplied
  • Calculations notes
  • The erection manual and instructions on the protection systems to apply on site

Looking for solutions for your next project?

DISCOVER OUR REFERENCES

Black Point Combined Cycle Power Plant

Bonna Indonesia delivers solutions to the extension of Black Point Power Plant in Hong Kong. Located in the New Territories region of Hong Kong, Black Point is one of the world’s largest gas-fired combined-cycle power stations. Bonna Indonesia supplied RCCP pipes & special fittings for the onshore & jacking of the cooling water  system.  

Jl.Pertigaan Mercedes No.2 Tlajung Udik, Gunung Putri Bogor, West Java