Bonna Intake Head Solution
PT. Bonna Indonesia designs and manufactures different diameters of Intake Head to fit customer project specifications, site conditions & environment.
The seawater intake structure consists of a large diameter system with equal sized opening windows and connected to the intake pipeline. Seawater moves slowly at a speed lower than 0.2-0.3 meters/second: it ensures the absolute minimum of sediment, marine life and debris. Seawater goes to the onshore water reservoir/basin.
The seawater intake head is a heavy duty stable and robust structure made of steel reinforced concrete consisting of 3 main elements: a tee, a circular corbel support and a velocity cap.
Its design is based on modular construction to fit marine contractors equipment, facilitate handling and avoid underwater welding. Chlorination kit and access manhole are included and pre-assembled in factory
Advantages of Bonna Intake Head
- Efficiency
- Time-saving
- Cost-saving
- Reliability
- Durability
Bonna Intake Head Installation
- Pre-cast structure is loaded on the barge
- Barge with the crane installs the intake head at the suitable position
- Diver assists during the installation to secure correct alignment
- After the installation, diver needs to verify that the structure properly rest on the gravel bed